Option A – Outside into Brick, Stone, or Concrete
- Labor cost – 8 credits
Option B – Outside into Siding
- Labor cost – 7 credits
Option C – Outside into Stucco
- Labor cost – 8 credits
Option D – Outside into Wood
- Labor cost – 7 credits
Option E – Inside into Drywall or Plaster
- Labor cost – 6 credits