fbpx

Reattach Handrail

Option A – Outside into Brick, Stone, or Concrete

  • Labor cost – 8 credits

Option B – Outside into Siding

  • Labor cost – 7 credits

Option C – Outside into Stucco

  • Labor cost – 8 credits

Option D – Outside into Wood

  • Labor cost – 7 credits

Option E – Inside into Drywall or Plaster

  • Labor cost – 6 credits
All prices reflect cost of labor. Additional charges will be made for materials needed to complete the job
What are your feelings