fbpx

Patch Ceiling up to 8′ High

  • Drywall only
  • Does not include texture or paint

Option A – Screw or Nail Holes

  • Labor cost – 4 credits

Option B – Up to 2″ by 2″

  • Labor cost – 6 credits

Option C – Up to 12″ by 12″

  • Labor cost – 13 credits
  • Medium visit or larger required

Option D – Up to 16″ by 16″

  • Labor cost – 14 credits
  • Medium visit or larger required
All prices reflect cost of labor. Additional charges will be made for materials needed to complete the job
What are your feelings